Cement bags, sand, aggregate and water for grades M5 to M30, from a slab size or a volume of concrete.

1 : 1 : 2 is for rough budgeting. It needs more than the 450 kg of cement per m³ that IS 456 allows, so get a design mix for structural M25.

Also building walls or plastering? Use the cement calculator. Ordering by cubic yard or premixed bag? Use the concrete calculator. Structural work should follow your engineer's drawings.

Version 1.0 Updated What's new

Release notes

  1. v1.0 Latest
    • New tool: cement, sand, aggregate and water for concrete grades M5 to M30, with pages for M15, M20, M25 and M30.

About the Concrete Mix Ratio Calculator

Pick the concrete grade on your drawing and enter a slab size or a volume. The calculator turns the mix ratio into bags of cement, sand, coarse aggregate and water, and shows what to measure out for every bag that goes into the mixer.

How to use it

  1. 1 Choose the grade, or Custom ratio to type your own.
  2. 2 Enter the slab length, width and thickness, or the volume of concrete.
  3. 3 Set the bag size and the extra for wastage.
  4. 4 Read the totals to buy and the batch for one bag of cement.

Frequently asked questions

What is the concrete mix ratio for each grade?

M5 is 1:5:10, M7.5 is 1:4:8, M10 is 1:3:6, M15 is 1:2:4 and M20 is 1:1.5:3 (cement : sand : coarse aggregate by volume). M25 is often quoted as 1:1:2, but from M25 upwards the mix should be designed and tested.

Which grade is used for a house roof slab?

M20 is the usual minimum for a reinforced slab in a mild, inland setting. Damp or coastal sites need a higher grade. Use the grade your structural engineer has written on the drawing.

What does M20 mean?

M stands for mix and the number is the strength in N/mm² that a standard concrete cube should reach 28 days after casting.

What is a 3 2 1 concrete mix?

It names the parts from the other end: 3 of gravel, 2 of sand and 1 of cement, which is 1:2:3 as cement : sand : aggregate. Choose Custom ratio and enter 2 and 3.

Should I measure the materials by volume or by weight?

Weighing is more accurate, because damp sand bulks and takes up more room than dry sand. On small jobs volume boxes are common: fill them level, use the same box every time and cut the water if the sand is wet.

Concrete grade and mix ratio chart

Ratios below are cement : sand : coarse aggregate by volume. Water is the most IS 456 permits for each 50 kg bag in a nominal mix.

  • M5, 1:5:10, up to 60 litres: levelling course.
  • M7.5, 1:4:8, up to 45 litres: lean concrete bed.
  • M10, 1:3:6, up to 34 litres: plain concrete under floors and footings.
  • M15, 1:2:4, up to 32 litres: paths, flooring and unreinforced work.
  • M20, 1:1.5:3, up to 30 litres: reinforced slabs, beams and columns in mild exposure.
  • M25 and above: design mix.

Where the fixed ratio ends and mix design begins

A nominal mix is a fixed recipe that ignores how your particular sand and stone are graded. IS 456 accepts it only up to M20. A design mix, worked out under IS 10262, starts from tests on the actual materials and states the kilograms of each per cubic metre. It usually reaches the same strength with less cement.

Getting the strength you paid for

  • Keep the water down. A sloppy mix places easily and ends up weak and cracked.
  • Use clean sand without silt, and keep aggregate off bare soil.
  • Mix until the colour is even, then place before it starts to stiffen.
  • Compact with a vibrator or rod to drive out trapped air.