M25 Concrete Mix Ratio

You will often see M25 given as 1 : 1 : 2. Treat that as a budgeting figure: IS 456 stops nominal mixes at M20, so M25 on a structural drawing means a design mix proportioned and cube-tested for your materials.

1 : 1 : 2 is for rough budgeting. It needs more than the 450 kg of cement per m³ that IS 456 allows, so get a design mix for structural M25.

The 1 : 1 : 2 figure works out to about 554 kg of cement per cubic metre, above the 450 kg limit IS 456 sets. A proper M25 design reaches the strength with less cement, which also means less shrinkage cracking and a lower bill.

M25 quantities for common sizes

At 1 : 1 : 2, 50 kg bags, before wastage.

ConcreteCement bagsSand (m³)Aggregate (m³)Water (L)
1 cubic metre 11.09 0.39 0.77 277
100 sq ft slab, 5 inches thick 13.08 0.45 0.91 327
500 sq ft slab, 5 inches thick 65.41 2.27 4.54 1,635
1,000 sq ft slab, 5 inches thick 130.82 4.54 9.08 3,271

Also building walls or plastering? Use the cement calculator. Ordering by cubic yard or premixed bag? Use the concrete calculator. Structural work should follow your engineer's drawings.

Version 1.0 Updated What's new

Release notes

  1. v1.0 Latest
    • New tool: cement, sand, aggregate and water for concrete grades M5 to M30, with pages for M15, M20, M25 and M30.

About the Concrete Mix Ratio Calculator

Pick the concrete grade on your drawing and enter a slab size or a volume. The calculator turns the mix ratio into bags of cement, sand, coarse aggregate and water, and shows what to measure out for every bag that goes into the mixer.

How to use it

  1. 1 Choose the grade, or Custom ratio to type your own.
  2. 2 Enter the slab length, width and thickness, or the volume of concrete.
  3. 3 Set the bag size and the extra for wastage.
  4. 4 Read the totals to buy and the batch for one bag of cement.

Frequently asked questions

What is the ratio for M25 concrete?

1 : 1 : 2 of cement, sand and coarse aggregate by volume, as a budgeting figure only. Structural work at this grade needs a design mix.

How many bags of cement are in 1 cubic metre of M25?

About 11.09 bags of 50 kg (554.4 kg) at 1 : 1 : 2, before wastage, together with 0.39 m³ of sand and 0.77 m³ of aggregate.

How much water does M25 need?

The mix design fixes it. IS 456 limits the water–cement ratio by exposure, for example 0.50 for moderate exposure, which is the setting where M25 is the lowest grade for reinforced work.