M30 Concrete Mix Ratio

There is no standard M30 ratio to shovel out on site. M30 is a design mix: a lab or ready-mix supplier fixes the kilograms of cement, sand, aggregate and water per cubic metre and proves them with cube tests.

1 : 1 : 2 is for rough budgeting. It needs more than the 450 kg of cement per m³ that IS 456 allows, so get a design mix for structural M25.

M30 is the minimum for reinforced concrete in severe exposure, such as coastal structures. For that exposure IS 456 also asks for at least 320 kg of cement per cubic metre and a water–cement ratio of 0.45 or lower.

Also building walls or plastering? Use the cement calculator. Ordering by cubic yard or premixed bag? Use the concrete calculator. Structural work should follow your engineer's drawings.

Version 1.0 Updated What's new

Release notes

  1. v1.0 Latest
    • New tool: cement, sand, aggregate and water for concrete grades M5 to M30, with pages for M15, M20, M25 and M30.

About the Concrete Mix Ratio Calculator

Pick the concrete grade on your drawing and enter a slab size or a volume. The calculator turns the mix ratio into bags of cement, sand, coarse aggregate and water, and shows what to measure out for every bag that goes into the mixer.

How to use it

  1. 1 Choose the grade, or Custom ratio to type your own.
  2. 2 Enter the slab length, width and thickness, or the volume of concrete.
  3. 3 Set the bag size and the extra for wastage.
  4. 4 Read the totals to buy and the batch for one bag of cement.

Frequently asked questions

What is the ratio for M30 concrete?

There is no standard one. M30 is a design mix, so the quantities come from trial mixes and cube tests on your cement, sand and aggregate. Ask your engineer, testing lab or ready-mix supplier for the mix design report.

How many bags of cement are in 1 cubic metre of M30?

The mix design decides. For reinforced concrete in severe exposure IS 456 allows between 320 and 450 kg of cement per cubic metre, which is 6.4 to 9 bags of 50 kg.

Can I mix M30 by hand on site?

It is not advisable. A design mix needs the materials weighed, the water controlled for the moisture already in the sand, and cubes cast to prove the strength. Ready-mix or a weigh batcher does that; boxes and buckets do not.